UNCLASSIFIED
           	APPR:	TF	(  )
          
          	DRAFT:	OC	(  )
          
          	CLEAR:	RC	(  )
          
          UNCLASSIFIED	CLEAR:		(  )
          
          	CLEAR:		(  )
          
          AID/PPC:OCARDUNER/PHENDERSON-OKEEFE:EP	CLEAR:		(  )
          12/21/98  2-0581/2-4976
          AID/AA/PPC:TFOX	CLEAR:		(  )
          
          AID/DAA/PPC:DDIJKERMAN(INFO)
          AID/PPC/CDIE:GBRITAN(INFO)
          AID/M/B:JPAINTER(DRAFT)
          AID/AFR:JSMITH(DRAFT)
          AID/ANE:JBRESLAR(DRAFT)
          AID/AA/LAC:MSCHNEIDER(DRAFT)
          AID/ENI:PMATHESON(DRAFT)
          AID/G:BTURNER(DRAFT)+
          
          
          PRIORITY AWIDE, CIS C PRIORITY, RIGA PRIORITY, SARAJEVO PRIORITY, BUJUMBURA PRIORITY, 
          	ASMARA PRIORITY, DAR ES SALAAM PRIORITY,+
          
          	
          
          
          
          ADM AID  FROM AA/PPC, TOM FOX TO MISSION DIRECTORS  AND 
          
          E.O. 12958:  N/A
          
          TAGS:
          
          SUBJECT:  FY 2001 RESULTS REVIEW AND RESOURCE REQUEST (R4)
          
          
          USAID/W OFFICE DIRECTORS
          
          
          I.  INTRODUCTION
          
	THIS CABLE PROVIDES R4 GUIDANCE FOR THE FY 2001 R4 CYCLE.  THE GUIDANCE REFLECTS SIGNIFICANT 
	CHANGES TO THE AGENCY'S MANAGEMENT FOR RESULTS SYSTEM AS PROPOSED BY AN
	INTER-BUREAU WORKING GROUP AND ENDORSED AT THE WORLDWIDE MISSION DIRECTORS
	CONFERENCE.  THE OBJECTIVE IS TO RESPOND TO THE CONCERN THAT PERFORMANCE
	REPORTING HAS BECOME TOO COSTLY IN TERMS OF LIMITED STAFF AND DOLLAR RESOURCES
	AND IS NOT WELL MATCHED TO ACTUAL BUDGET DECISION-MAKING PROCESSES.
	
		THESE CHANGES HAVE BEEN DISCUSSED WITH THE HILL AND OMB.  PPC IS WORKING
	INTENSIVELY WITH THESE STAKEHOLDERS TO REACH AGREEMENT ON ADEQUATE AND
	COST-EFFECTIVE STANDARDS FOR PERFORMANCE REPORTING WHICH MEETS GPRA REQUIREMENTS
	AND INTERNAL AGENCY MANAGEMENT NEEDS.  PPC IS ALSO WORKING UNCLASSIFIED WITH
	STATE TO IMPROVE THE MISSION PERFORMANCE AND RESULTS PLANS (MPP) PROCESS AND ITS
	ALIGNMENT WITH USAID PLANNING PROCESSES.  RELATED AREAS OF THE
	MANAGEMENT-FOR-RESULTS SYSTEM WILL BE UNDER REVIEW IN COMING WEEKS AND MONTHS,
	INCLUDING STRATEGIC PLANNING GUIDANCE, NON-PRESENCE COUNTRY PROGRAMMING AND
	REPORTING, AND CONGRESSIONAL NOTIFICATION.
	
		THE FOLLOWING SECTION-BY-SECTION TABLE OF CONTENTS IS PROVIDED TO FACILITATE
	USE OF THE CABLE:           
          SECTION:
          
           I.	 -- INTRODUCTION
             
          II. -- GENERAL INSTRUCTIONS
           A. -- BACKGROUND AND ACTION REQUEST
           B. -- BUDGET OUTLOOK
           C. -- MPP LINKAGE
           D. -- CHANGES TO THE MANAGEMENT CONTRACT
           E. -- WHO SHOULD SUBMIT
           F. -- FORMATTING INSTRUCTIONS
           G. -- SUBMISSION SCHEDULE & CONTACT POINTS
           H. -- SUPPLEMENTAL REFERENCES
          
          III. -- R4 OUTLINE AND DRAFTING INSTRUCTIONS
           A. -- COVER MEMO
           B. -- R4 PART I: OVERVIEW
           C. -- R4 PART II: RESULTS REVIEW
           D. -- R4 PART III (OLD): STATUS OF THE MANAGEMENT    
                 CONTRACT (NOW CONTAINED IN COVER MEMO)
           E. -- R4 PART III (NEW): RESOURCE REQUEST
           F. -- WORKFORCE AND OE
           G. -- SUPPLEMENTAL INFORMATION ANNEXES
          
          IV. -- SPECIAL REPORTING SITUATIONS
           A. -- G BUREAU FIELD SUPPORT
           B. -- BHR PROGRAMMED RESOURCES
           C. -- CLOSEOUT AND GRADUATION
           D. -- NON-PRESENCE COUNTRIES
          
          V. -- CHANGES IN WASHINGTON R4 REVIEW PROCESS
          
	II.	GENERAL INSTRUCTIONS
	
		A.	BACKGROUND AND ACTION REQUEST
	
		R4S HAVE BEEN USED TO SATISFY INFORMATION NEEDS AT SEVERAL LEVELS:  BY
	MISSIONS TO DETERMINE IF PROGRAMS AND RESOURCES NEED ADJUSTMENT TO MAXIMIZE
	IMPACT; BY REGIONAL BUREAUS TO ALLOCATE RESOURCES ACROSS COUNTRIES TO MEET
	DEVELOPMENT AND FOREIGN POLICY GOALS; AND BY CENTRAL BUREAUS FOR EXTERNAL AGENCY
	REPORTING AND BUDGET PREPARATION.
	
		AFTER ANALYZING CURRENT PRACTICE, THE R4 WORKING GROUP, CONVOKED BY THE
	ADMINISTRATOR, REACHED SEVERAL CONCLUSIONS:  (1) R4S GENERALLY PROVIDE MISSION
	MANAGEMENT WITH SUFFICIENT INFORMATION TO MANAGE FOR RESULTS AND IMPLEMENT
	APPROPRIATE PERFORMANCE-BASED BUDGETING; (2) R4S PROVIDE REGIONAL BUREAUS WITH
	MORE THAN ENOUGH INFORMATION FOR ACTUAL BUREAU MANAGEMENT AND BUDGETING NEEDS;
	AND (3) R4S WERE SOMEWHAT CUMBERSOME IN TRANSMITTING INFORMATION FOR AGENCY-WIDE
	PLANNING AND REPORTING PURPOSES.  THE VIEW THAT R4S SHOULD BE THE SOLE OR MAIN
	BASIS FOR BUDGET DECISIONS ENCOURAGED BUREAUS TO REQUEST, AND MISSIONS TO
	PROVIDE, MORE INFORMATION THAN COULD EFFECTIVELY BE USED.  WASHINGTON REVIEWS
	BECAME TOO LABOR INTENSIVE AND EXCESSIVELY FOCUSED ON DETAILED NUMERIC SCORING
	AND RANKING.  BY CONTRAST, INSUFFICIENT EFFORT WAS GIVEN TO SYNTHESIZING REGIONAL
	AND GLOBAL TRENDS AND AGENCY-WIDE IMPACT.
	
		THE COMPLETE R4 WORKING GROUP REPORT CAN BE OBTAINED ON THE AGENCY'S INTERNAL
	AND EXTERNAL WEBSITES WITH RELATED MISSION DIRECTORS CONFERENCE MATERIALS. 
	PPC/CDIE TIPS NO. 12, AN ANNEX TO THE REPORT, PROVIDES UPDATED GUIDANCE ON
	PERFORMANCE MONITORING STANDARDS.  THE CHANGES DESCRIBED BELOW SHOULD NOT BE
	MISCONSTRUED AS A SHIFT AWAY FROM RESULTS MANAGEMENT.  RATHER, IT IS AN EFFORT TO
	BETTER ALIGN OUR SYSTEMS TO THE TYPES OF RESOURCE ALLOCATION DECISIONS WHICH ARE
	POSSIBLE, GIVEN NON-PERFORMANCE FACTORS THAT MUST BE TAKEN INTO ACCOUNT, AND THE
	LIMITATIONS OF EXISTING METHODOLOGIES FOR CROSS-COUNTRY AND CROSS-GOAL
	PERFORMANCE COMPARISONS.  DESPITE SUCH DIFFICULTIES, WE REMAIN COMMITTED TO
	APPLYING RESULTS- BASED MANAGEMENT TECHNIQUES AT ALL POSSIBLE POINTS.
	
		R4S WILL CONTINUE TO BE REQUIRED FOR EVERY OPERATING UNIT EVERY YEAR.	 MAJOR
	CHANGES TO BE IMPLEMENTED IMMEDIATELY INCLUDE:
	
		- ELIMINATING PERFORMANCE MEASURES THAT ARE NOT USEFUL FOR
	MANAGEMENT-FOR-RESULTS DECISION-MAKING;
	
		- REDUCING THE PRESCRIBED LENGTH OF R4 DOCUMENTS, WHILE ALLOWING LIMITED USE
	OF ANNEXES TO MEET SPECIAL NEEDS;
	
		- REDUCING THE FREQUENCY OF FORMAL TRADITIONAL USAID/WASHINGTON PROGRAM
	REVIEWS TO ONCE EVERY THREE YEARS FOR MOST PROGRAMS, WHILE ALLOWING BUREAUS TO
	INCREASE THE FREQUENCY OF SELECTED COUNTRY REVIEWS WHEN SPECIAL CIRCUMSTANCES
	WARRANT;
	
		- ELIMINATING COMPARISON RANK-ORDERING OF STRATEGIC OBJECTIVES (SO'S) ACROSS
	A REGION OR GOAL AREA AS WELL AS RELATIVE PRIORITY RANKINGS OF SO'S FOR A GIVEN
	COUNTRY PROGRAM;
	
		- INTRODUCING A COVER MEMO FOR MISSION MANAGEMENT TO  CANDIDLY HIGHLIGHT
	SPECIFIC ISSUES REQUIRING USAID/W ACTION;
	
		- ISSUING MANAGEMENT CONTRACT CABLES ONLY IN YEARS WHEN SPECIFIC CHANGES TO
	THE CONTRACT ARE MADE.  ROUTINE USE OF CABLES FOLLOWING EVERY R4 SUBMISSION WOULD
	BE DROPPED, AND
	
		- STRIVING TO PROMOTE BETTER TEAMWORK BETWEEN WASHINGTON AND THE FIELD
	FOCUSED ON ACHIEVING RESULTS AND IMPROVING THE FLOW OF COMMUNICATION.
	
		OPERATING UNITS AND THEIR BUREAUS ARE REQUESTED TO INITIATE THE FOLLOWING
	ACTIONS TO HELP IMPLEMENT THE CHANGES LISTED ABOVE:
	
		1.  PERFORMANCE MONITORING PLAN REVISIONS:  REVIEW YOUR SO PERFORMANCE
	MONITORING PLANS AND RELATED SECTIONS OF GRANTS AND CONTRACTS, AND ELIMINATE
	PERFORMANCE MEASURES WHICH ARE NOT BEING USED FOR RESULTS MANAGEMENT.	 THE
	OBJECTIVE IS TO REDUCE THE COST AND BURDEN OF PERFORMANCE REPORTING BY
	ELIMINATING INDICATORS THAT ARE NOT DIRECTLY USEFUL IN ASSESSING PROGRESS IN
	MEETING OBJECTIVES, MAKING IMPLEMENTATION MANAGEMENT DECISIONS, OR MEETING
	SPECIFIC AGENCY REPORTING REQUIREMENTS. IF A GRANTEE ANSWERS TO MULTIPLE
	OPERATING UNITS (E.G., THE MISSION AND G OR BHR), THOSE OPERATING UNITS SHOULD
	WORK TOGETHER WITH THE RESPONSIBLE GRANTS OFFICER TO INSURE THAT THE GRANTEE IS
	NOT BURDENED WITH EXCESSIVE AND NON-OVERLAPPING PERFORMANCE INDICATORS. 
	OPERATING UNITS CAN BEGIN THE PROCESS OF WEEDING-OUT THEIR PERFORMANCE INDICATORS
	WHILE PREPARING THIS R4.  THIS EFFORT SHOULD BE COMPLETED WITHIN A YEAR, IF
	POSSIBLE BY THE DUE DATE OF THE FY 2002 R4.  SEE II.D. BELOW FOR ADDITIONAL
	GUIDANCE ON CHANGING INDICATORS.
	
		2. REVIEW SCHEDULE:	 BUREAUS WILL ADVISE OPERATING UNITS WHICH PROGRAMS WILL
	BE SCHEDULED FOR FORMAL PROGRAM WEEK REVIEWS IN FY 99 AND THE SCHEDULE FOR THOSE
	REVIEWS.	THE INTENT IS TO HOLD SUCH REVIEWS ONLY WHEN NEEDED BUT NOT LESS THAN
	ONCE EVERY THREE YEARS.  R4S SHOULD BE SUBMITTED BETWEEN MARCH 1 AND APRIL 1
	UNLESS OTHERWISE NOTIFIED BY YOUR HOME BUREAU (SEE G BELOW).  INFORMATION ABOUT
	PROGRAM PROGRESS SHOULD CONTINUE TO BE SHARED BETWEEN THE FIELD AND WASHINGTON
	THROUGH E-MAILS, DESK OFFICERS, EVALUATIONS, PERIODIC CONSULTATIONS WITH MISSION
	STAFF AS THEY TRANSIT WASHINGTON, FIELD TRAVEL BY WASHINGTON STAFF, AND SPECIAL
	CONSULTATIONS WITH MISSION MANAGEMENT AS DETERMINED BY THE MISSION AND REGIONAL
	BUREAU.
	
	SECTION V BELOW PROVIDES SUMMARY INFORMATION FOR R4 DRAFTERS ON CHANGES TO
	THE WASHINGTON R4 REVIEW PROCESS. OF PARTICULAR INTEREST TO MISSIONS AND SO TEAMS
	WILL BE THE ELIMINATION OF POINT SCORING OF INDIVIDUAL STRATEGIC OBJECTIVES AND
	RELATED COMPARISON-RANKINGS EXERCISES.           
	
          B.  BUDGET OUTLOOK
          
	DISCRETIONARY FUNDING IS IN VERY SHORT SUPPLY RELATIVE TO LEGITIMATE PROGRAM
	REQUIREMENTS.  THIS IS ESPECIALLY TRUE FOR DA FUNDS FOR ECONOMIC GROWTH.  WE
	EXPECT CONTINUING FUNDING PRIORITY FOR CHILD SURVIVAL, AIDS, INFECTIOUS DISEASES,
	BASIC EDUCATION, AND, IN THE ECONOMIC GROWTH AREA, MICROENTERPRISE AND
	AGRICULTURE.  WE ALSO EXPECT MORE LIMITED AND MORE TARGETED ASSISTANCE FOR
	NON-PRESENCE COUNTRIES.  THESE PRIORITIES NOTWITHSTANDING, THE ADMINISTRATION
	INTENDS TO CONTINUE SUPPORT FOR POPULATION, ENVIRONMENT AND DEMOCRACY.  FOR
	PLANNING PURPOSES, THE AGENCY IS PROJECTING THE OVERALL COMBINED LEVEL OF DA AND
	CS/D FUNDING TO REMAIN AT ABOUT CURRENTLY APPROPRIATED LEVELS OVER THE NEXT
	SEVERAL YEARS.  WE ANTICIPATE LEVELS FOR EASTERN EUROPE AND THE NIS WILL DECLINE
	GRADUALLY. MONEY FOR THE MIDDLE-EAST PEACE PROCESS COUNTRIES SHOULD STAY FAIRLY
	CONSTANT OVERALL WITH SOME SHIFTING OF LEVELS AMONG COUNTRIES.  FOOD AND DISASTER
	ASSISTANCE PROGRAMS WILL CONTINUE TO BE FUNDED AT RECENT LEVELS.  PL 480 TITLE
	III, HOWEVER, WILL BE REDUCED FURTHER IF NOT ELIMINATED. 
	
	C.	 MISSION PERFORMANCE PLAN (MPP) LINKAGE
	
		USAID AND STATE ARE COORDINATING CLOSELY TO ENSURE CONSISTENCY BETWEEN MPP'S
	AND THE R-4.  THE MPP IS THE AUTHORITATIVE INTEGRATED INTERAGENCY COUNTRY
	STRATEGY DOCUMENT PREPARED BY THE COUNTRY TEAM AND APPROVED BY THE CHIEF OF
	MISSION.	IN ADDITION TO DEFINING GOALS AND PLANNED PERFORMANCE, IT ALSO SERVES
	TO REPORT ON PAST PERFORMANCE AND REQUEST RESOURCES.  MPP GOALS ARE BASED ON THE
	NATIONAL INTERESTS AND STRATEGIC GOALS CONTAINED IN THE INTERNATIONAL AFFAIRS
	STRATEGIC PLAN (IASP).  THE IASP INCORPORATES USAID'S AGENCY STRATEGIC PLAN
	GOALS.  NOW BEING UPDATED WITH USAID INPUT, THE CURRENT IASP DOCUMENT WILL BE
	DISTRIBUTED TO ALL POSTS AND WILL BE AVAILABLE ON THE STATE DEPARTMENT WEBSITE
	(WWW.STATE.GOV).
	
		MPP AND R-4 PREPARATION WILL BE BETTER SYNCHRONIZED IN THIS CYCLE.  STATE
	ANTICIPATES ISSUING MPP GUIDANCE IN FEBRUARY WITH A MID-APRIL MPP SUBMISSION DUE
	DATE.  USAID MISSIONS ARE EXPECTED TO BE INTEGRAL PARTICIPANTS IN PREPARING THE
	MPP.  USAID OFFICERS CAN LEND THEIR EXTENSIVE PLANNING AND RESOURCE MANAGEMENT
	EXPERIENCE TO HELP PREPARE HIGHER QUALITY AND RIGOROUS MPPS.  THE USAID COUNTRY
	STRATEGY AND R4 COMPLEMENT THE MPP BY PROVIDING THE DETAILED DESCRIPTION AND
	ANALYSIS OF USAID-MANAGED OBJECTIVES AND RELATED PERFORMANCE AND BUDGET PLANNING
	INFORMATION.  THE MPP SHOULD, THEREFORE, SIMPLY INCORPORATE USAID STRATEGIC
	OBJECTIVES AND RELATED RESOURCE DATA UNDER THE APPROPRIATE MPP GOAL AND NATIONAL
	INTEREST.	 WASHINGTON AGENCIES WILL REVIEW AND APPROVE MPPS TO ENSURE AGREEMENT
	ON CRITICAL NATIONAL INTERESTS AND PRIORITIES AND RELATED RESOURCE REQUESTS. 
	USAID WILL BE A FULL PARTICIPANT IN MPP REVIEWS FOR ALL COUNTRIES THAT RECEIVE,
	OR PROPOSE RECEIVING, USAID FUNDING AND WILL CLEAR ANY MPP-RELATED FOLLOW-UP
	ACTIONS THAT RELATE SPECIFICALLY TO USAID-MANAGED OBJECTIVES.  STATE WILL BE
	INVITED TO PARTICIPATE IN PROGRAM WEEK REVIEWS OF R4S WHEN SCHEDULED.
	
		R-4 DOCUMENTS SHOULD IDENTIFY WHICH MPP GOAL AND NATIONAL INTEREST ARE
	SUPPORTED BY EACH USAID STRATEGIC OBJECTIVE, AND NOTE THAT THESE LINKAGES ARE
	CONSISTENT WITH MPPS.  THE MPP WILL REQUIRE THAT EACH USAID OBJECTIVE SHOULD BE
	DESCRIBED UNDER ONE PRIMARY MPP GOAL (SUPPORT TO SECONDARY GOALS CAN BE
	INDICATED).  IN SOME CASES, SUCH AS INTEGRATED HEALTH AND FAMILY PLANNING
	OBJECTIVES, WHICH COULD SUPPORT MORE THAN ONE IASP GOAL (E.G., HEALTH AND FAMILY
	PLANNING ARE LISTED AS SEPARATE GOALS IN THE IASP), A CHOICE WILL HAVE TO BE MADE
	IN DETERMINING WHICH IASP/MPP GOAL IS PRIMARY.  USAID EDUCATION SO'S MAY ALSO
	HAVE TO BE SOMEWHAT ARBITRARILY LINKED TO ONE PRIMARY MPP GOAL EVEN THOUGH THEY
	MAY BENEFIT MORE THAN ONE.
	
		PPC/PC IS THE PRINCIPAL CONTACT POINT WITH STATE/RPP ON MPP/R4 COORDINATION
	AND WILL ASSIST IN ADDRESSING QUESTIONS THAT MAY ARISE RELATED TO GUIDANCE. 
	REGIONAL BUREAUS WILL HAVE THE LEAD IN COORDINATING R4 AND MPP REVIEWS WITH THEIR
	STATE COUNTERPARTS.           

          D.  CHANGES TO THE MANAGEMENT CONTRACT
          
          WASHINGTON REGULARLY RECEIVES REQUESTS FROM THE FIELD 
          ASKING FOR CLARIFICATION ON WHAT TYPES OF CHANGES TO THE 
          MANAGEMENT CONTRACT REQUIRE WASHINGTON RATHER THAN FIELD LEVEL 
          APPROVAL.  BUREAUS HAVE VARIED SIGNIFICANTLY IN THEIR RESPONSE 
          OVER THE PAST THREE YEARS.  THIS HAS CREATED SOME CONCERN AMONG 
          MISSION STAFF AND PARTNERS WHO SEE DIFFERENT TREATMENTS FOR 
          APPARENTLY SIMILAR PROGRAMS.  THE FOLLOWING IS INTENDED TO 
          PROVIDE STANDARD GUIDANCE THAT SHOULD COVER MANY SITUATIONS.  
          VARIATIONS OR AMPLIFICATIONS OF THIS GUIDANCE, IF ANY, WILL BE 
          PROVIDED IN WRITING BY INDIVIDUAL BUREAUS WITH CLEARANCE FROM 
          PPC.  PPC WILL WORK WITH BUREAUS TO SEEK A REASONABLE DEGREE OF 
          CONSISTENCY AND PREDICTABILITY, KEEPING IN MIND THE NEED FOR SOME 
          OPERATIONAL FLEXIBILITY. 
          
          1. CHANGES AT THE SO LEVEL:  PER ADS SECTION 
          E201.5.16D.1, OPERATING UNITS RESPONSIBLE FOR EXECUTING STRATEGIC 
          PLANS HAVE AUTHORITY TO APPROVE MINOR CHANGES OR REFINEMENTS IN 
          AN SO SIGNIFICANT CHANGES, HOWEVER, MUST BE FORMALLY APPROVED BY 
          THE REGIONAL AA WITH PPC, M, AND OTHER CLEARANCES.  IF IN DOUBT 
          AS TO WHETHER A CHANGE WOULD BE CONSIDERED MINOR OR SIGNIFICANT, 
          OPERATING UNITS ARE ADVISED TO CONSULT WITH THEIR REGIONAL BUREAU 
          OR DP OFFICE.  MINOR CHANGES SHOULD BE EXPLICITLY NOTED IN THE R4 
          WITHOUT REQUESTING FORMAL APPROVAL.  SIGNIFICANT CHANGES WOULD BE 
          REQUESTED IN THE R4 COVER MEMO AND APPROVED BY A MANAGEMENT 
          CONTRACT CABLE.
          
          2. CHANGES IN INTERMEDIATE RESULTS BELOW THE SO LEVEL:  
          OPERATING UNITS HAVE THE AUTHORITY TO APPROVE CHANGES TO A 
          RESULTS FRAMEWORK BELOW THE SO LEVEL.  THIS GENERAL AUTHORITY MAY 
          HAVE BEEN RESTRICTED, HOWEVER, IN MANAGEMENT CONTRACTS THAT 
          APPROVED SPECIFIC STRATEGIC PLANS.  EVEN IF NOT FORMALLY 
          RESTRICTED, IT WILL USUALLY BE PRUDENT TO CONSULT VIA EMAIL WITH 
          YOUR BUREAU BEFORE APPROVING CHANGES TO THE RESULTS FRAMEWORK.  
          ANY CHANGE SHOULD BE WELL DESCRIBED AND EXPLAINED IN THE R4 
          DOCUMENT.  IF THE HOME BUREAU DEEMS IT A CHANGE IN THE MANAGEMENT 
          CONTRACT, IT WILL CONFIRM THIS BY ISSUING A MANAGEMENT CONTRACT 
          CABLE APPROVING OR DENYING THE CHANGE.  IF NO CABLE IS ISSUED, 
          THE OPERATING UNIT MAY CONSIDER THE CHANGE TO BE WITHIN ITS 
          AUTHORITY TO IMPLEMENT. 
          
          3. CHANGES TO PERFORMANCE INDICATORS:  SOME CONFUSION 
          HAS EXISTED REGARDING THE NEED FOR WASHINGTON APPROVAL TO CHANGES 
          IN PERFORMANCE INDICATORS.  THE ADS ANTICIPATES THAT PERFORMANCE 
          INDICATORS WOULD BE DEVELOPED AND FINALIZED AFTER A STRATEGIC 
          PLAN IS APPROVED AND, THEREFORE, WOULD NOT BE PART OF THE 
          MANAGEMENT CONTRACT.  ON THE OTHER HAND, SOME MISSIONS AND 
          BUREAUS HAVE USED PERFORMANCE INDICATORS AND SPECIFIC TARGETS AS 
          A WAY OF PROVIDING A MORE SPECIFIC DESCRIPTION OF AN SO OR 
          INTERMEDIATE RESULT.  WHEN THESE INDICATORS HAVE BEEN APPROVED 
          TOGETHER WITH STRATEGIC OBJECTIVES IN A MANAGEMENT CONTRACT, THEY 
          EFFECTIVELY BECOME PART OF THE CONTRACT AND BUREAUS EXPECT TO 
          APPROVE PROPOSED CHANGES.  PER SECTION II.A. ABOVE, OPERATING 
          UNITS ARE URGED TO REVIEW INDICATORS OF PERFORMANCE AND ELIMINATE 
          THOSE THAT ARE NOT USEFUL OR COST EFFECTIVE IN RESULTS MANAGEMENT 
          AT THE MISSION LEVEL.  OPERATING UNITS SHOULD REFER TO CDIE TIPS 
          NO. 7 ON PREPARING A PERFORMANCE MONITORING PLAN FOR SUPPLEMENTAL 
          GUIDANCE.  BECAUSE SOME INDICATOR CHANGES MAY BE SEEN AS 
          MODIFYING AN EARLIER MANAGEMENT CONTRACT, UNITS SHOULD DESCRIBE 
          THE CHANGES THEY ARE MAKING IN THE AREA OF PERFORMANCE 
          MEASUREMENT IN THE COVER MEMO TO THE R4. (SEE INSTRUCTIONS 
          BELOW).  HOWEVER, NO FORMAL APPROVAL FOR THESE CHANGES IS 
          NECESSARY.  BUREAUS WILL ASSESS MISSION PROGRESS IN MAKING SUCH 
          CHANGES AND ADVISE IF CONCERNS ARISE WITH RESPECT TO EXTERNAL 
          PERFORMANCE REPORTING OR OTHER INTERNAL MANAGEMENT NEEDS.  
          OPTIONS FOR ADDRESSING SUCH CONCERNS, INCLUDING POSSIBLE USE OF 
          SUPPLEMENTARY REPORTING ANNEXES AS DESCRIBED IN III.G. BELOW, 
          WILL BE REVIEWED WITH PPC.
          
          E. WHO SHOULD SUBMIT
          
          ALL OPERATING UNITS ARE REQUIRED TO SUBMIT COMPLETE 
          R4S ANNUALLY UNLESS THEY DO NOT NEED PROGRAM FUNDS AND/OR 
          OPERATING EXPENSE FUNDS AFTER THE CURRENT FISCAL YEAR.  IN THE 
          LATTER CASE, ONLY THE RESULTS REVIEW PORTION OF THE R4 MUST BE 
          SUBMITTED. 
          
          F.  ELECTRONIC FORMAT AND PERFORMANCE DATA TABLES
          
          THE FOLLOWING STANDARDIZED FORMAT INSTRUCTIONS ARE 
          AIMED AT ALLOWING MORE RAPID AND EFFICIENT DISTRIBUTION OF R4 
          SECTIONS TO APPROPRIATE REVIEWERS FOR VARIOUS EXTERNAL AGENCY 
          REPORT PREPARATION (E.G., CP, APP, APR).  PLEASE SUBMIT BOTH 
          HARD AND ELECTRONIC COPIES OF YOUR DOCUMENT. BECAUSE OF THE Y2K 
          UPGRADE EFFORT, ALL UNITS SHOULD BE CONVERTED TO MICROSOFT 
          OFFICE 97 FORMATS (WORD AND EXCEL) BY THE TIME OF THIS 
          SUBMISSION.  WHERE UPGRADES HAVE NOT OCCURRED, ELECTRONIC FILES 
          WILL BE ACCEPTABLE IN (LOTUS AND WORDPERFECT).  PLEASE DO NOT 
          COMPRESS OR ZIP FILES, AND AVOID GRAPHICS.  USE ONLY THE 
          WORKSHEETS, MACROS OR FORMATS PROVIDED BY YOUR BUREAUS.  PREPARE 
          NARRATIVES USING 12-POINT TIMES NEW ROMAN TYPEFACE.  
          
          R4S SHOULD BE SUBMITTED TO TWO LOCATIONS:  YOUR 
          REGIONAL OR CENTRAL BUREAU AND THE USAID DEVELOPMENT EXPERIENCE 
          CLEARINGHOUSE USING THE FOLLOWING EMAIL ADDRESS: 
          CDIE_DOCUMENT_SUBMISSIONS.  ALL ELECTRONIC SUBMISSIONS SHOULD 
          USE A STANDARD FILE NAMING CONVENTION.  THE FILES AND THE 
          SUGGESTED FILE NAMES ARE:
          
	R4CNTRY -	THIS FILE WILL CONTAIN THE FULL TEXT OF THE R4 
	--------- DOCUMENT, INCLUDING PERFORMANCE DATA TABLES AND 
	--------- SUPPLEMENTAL ANNEXES AND WILL NOT BE SHARED WITH 
	--------- PARTNERS AND THE PUBLIC.  THE BOLIVIA REPORT 
	--------- FILE, FOR EXAMPLE, WOULD BE NAMED R4BOLIV.

	R2CNTRY - THIS FILE WILL CONTAIN ONLY THE RESULTS REVIEW 
	---------ÊNARRATIVE AND PERFORMANCE DATA TABLES; AS IT IS 
	--------- INTENDED FOR PUBLIC ACCESS, IT MUST NOT, REPEAT, 
	--------- NOT INCLUDE THE COVER MEMO, OR THE NARRATIVE
	--------- PORTION OF THE RESOURCES REQUEST. IT MUST 
	--------- ALSO EXCLUDE ANY REFERENCES TO "PRE-DECISIONAL"
	--------- BUDGET INFORMATION.  THIS FILE WILL BE MADE 
	--------- AVAILABLE ON THE EXTERNAL USAID WEB SITE.

	R2CTRDAT - THIS FILE WILL CONTAIN SPREADSHEETS CONSISTING 
	--------- OF PRE-FORMATTED BUDGET TABLES.

	ANXZZZ - FOR MISSIONS SENDING "SPECIAL INFORMATION 
	-------- ANNEXES" (SEE SECTION III.G), PLEASE SEND A 
	-------- SEPARATE FILE FOR EACH "SPECIAL INFORMATION 
	-------- ANNEX".  WE SUGGEST USING A THREE-LETTER CODE 
	-------- REFERENCING THE ANNEX TOPIC IN EACH FILENAME TO 
	-------- FACILITATE IDENTIFICATION (SEE III.G). ANNEXES 
	-------- FOR NON-PRESENCE COUNTRIES SHOULD FOLLOW THE 
	-------- NAMING CONVENTIONS ABOVE (R4CNTRY, ETC.).

          DO NOT ASSIGN AN EXTENSION TO THESE FILES, I.E., 
          R2CNTRY.DOC;  ALLOW THE SOFTWARE APPLICATION TO AUTOMATICALLY 
          ASSIGN THE EXTENSION FOR THAT SOFTWARE APPLICATION SO USAID/W 
          CAN IDENTIFY THE TYPE OF FILE SUBMITTED.
          
          POLICY NOTICE NO. 19 OF OCT 19, 1998, REVISING ADS 
          SECTION 210.5.16E REQUIRES THE FOLLOWING WORDING ON THE COVER 
          PAGE OF EACH R4:
          
          - THE ATTACHED RESULTS INFORMATION IS FROM THE FY XXXX 
          RESULTS REVIEW AND RESOURCE REQUEST (R4) FOR (COUNTRY OR OPU) 
          AND WAS ASSEMBLED AND ANALYZED BY (USAID/OPU).
          
          - THE R4 IS A "PRE-DECISIONAL" USAID DOCUMENT AND DOES
          NOT REFLECT RESULTS STEMMING FROM FORMAL USAID 
          REVIEWS.  ADDITIONAL INFORMATION ON THE ATTACHED CAN BE OBTAINED 
          FROM (CONTACT PERSON AND OFFICE MAKING THE DISTRIBUTION).
          
          - RELATED DOCUMENT INFORMATION CAN BE OBTAINED FROM:
          USAID DEVELOPMENT EXPERIENCE CLEARINGHOUSE
          1611 N. KENT ST., SUITE 200
          ARLINGTON, VA. 22209-2111
          TELEPHONE: 703-351-4006 EXT. 106
          FAX: 703-351-4039
          EMAIL: DOCORDER@DEC.CDIE.ORG
          INTERNET: HTTP://WWW.DEC.ORG
          
          G.  SUBMISSION SCHEDULE AND CONTACT POINTS 
          
          UNLESS OTHERWISE ADVISED BY YOUR REGIONAL BUREAU, ALL 
          R4S ARE TO BE SUBMITTED BETWEEN MARCH 1 AND APRIL 1, 1999.  
          BUREAUS WILL ADVISE OPERATING UNITS REGARDING BUREAU R4 CONTACT 
          POINTS.  IN SOME CASES, YOUR BUREAU CONTACT MAY FORWARD 
          QUESTIONS TO YOUR PPC COORDINATOR (PARRIE HENDERSON-OKEEFE:  AFR 
          AND ENI; TOM RISHOI:  LAC AND G; DEBBIE PRINDLE: ANE; AND LARRY 
          LAIRD:  BHR).  QUESTIONS ADDRESSED TO PPC (AND THE ANSWERS) WILL 
          BE POSTED ON THE PPC WEB PAGE (WWW.USAID.GOV/PPC).  CASES OF 
          CONFLICTING OR UNCLEARED SUPPLEMENTARY GUIDANCE SHOULD BE 
          REPORTED TO OLIVIER CARDUNER, PPC/PC, FOR RESOLUTION (SEE III.G. 
          BELOW).  QUESTIONS ABOUT PERFORMANCE-INFORMED BUDGETING SHOULD 
          GO TO BUREAU BUDGET OFFICES, COPIED TO TEDDY WOOD-STERVINOU, 
          M/B/PA, AND THOSE RELATED TO WORKFORCE PLANNING TO BUREAU AMS 
          OFFICES, COPIED TO MARCUS RARICK, M/B/SB.  QUESTIONS ABOUT THE 
          STRATEGIC PLAN FOR INTERNATIONAL AFFAIRS (SPIA), MPPS OR THE 
          USAID STRATEGIC PLAN SHOULD BE ADDRESSED TO OLIVIER CARDUNER, 
          PPC/PC AND COPIED TO YOUR BUREAUS.
          
          H. SUPPLEMENTAL GUIDANCE FOR R4 PREPARATION
          
          THE FOLLOWING INFORMATION ON R4 PREPARATION WILL BE 
          MADE AVAILABLE THROUGH YOUR BUREAU CONTACT, AND THE PPC WEB PAGE 
          AT WWW.USAID.GOV/PPC:
          
          1.	MANAGEMENT FOR RESULTS WORKING GROUP REPORT 
                PRESENTED AT MISSION DIRECTORS CONFERENCE.
          2.	R4 GUIDANCE CABLE ISSUES RESOLUTION MEMO
          3.	CDIE TIPS NUMBER 12 - GUIDELINES FOR INDICATOR AND 
                DATA QUALITY.
          4.	CDIE TIPS NUMBER 7 - PREPARING A PERFORMANCE 
                MONITORING PLAN
          5.	CDIE TIPS NUMBER 5 - ESTABLISHING PERFORMANCE 
                TARGETS
          6.	SAMPLES/EXAMPLES OF THE REVISED SO REPORTING 
                REQUIREMENTS REQUESTED BELOW
          7.	INDICATOR TABLE MACROS (PERFORMANCE DATA TABLE 
                MACROS IN BOTH WORDPERFECT 5.2 AND MICROSOFT WORD CAN ALSO BE 
                DOWNLOADED FROM THE PPC/CDIE WEBSITE, "CDIE ONLINE"; 
                HTTP://CDIE.USAID.GOV)
          8.	BUDGET AND WORKFORCE TABLES WITH EXPLANATIONS 
          9.	FIELD SUPPORT TABLE
          
          III.	R4 OUTLINE AND DRAFTING INSTRUCTIONS
          
          PLEASE NOTE NEW PAGE LENGTH LIMITS FOR EACH SECTION.  
          THE OBJECTIVE IS TO MAKE R4S MORE ACCESSIBLE TO READERS AT ALL 
          LEVELS OF THE USAID HIERARCHY AND BEYOND; AND TO REDUCE THE TIME 
          NEEDED TO PREPARE AND COMPLETE DOCUMENT ANALYSIS.  THE REALITY 
          IS THAT LONG DOCUMENTS TEND NOT TO BE READ AND ARE OFTEN TOO 
          DIFFUSE IN THE MESSAGES THEY ARE TRYING TO CONVEY.  YOU ARE 
          URGED TO STAY WITHIN THE PRESCRIBED PAGE LIMITS AND MAKE 
          SELECTIVE USE OF ANNEXES FOR ADDITIONAL INFORMATION AS DESCRIBED 
          IN III.G. BELOW ONLY WHEN A CLEAR NEED AND TARGET AUDIENCE 
          EXISTS. 
          
          A.  COVER MEMO: (1-2 PAGES.) USED, AT MISSION'S OPTION AND 
          DISCRETION, TO IDENTIFY MANAGEMENT OR RESOURCE ISSUES NEEDING 
          SPECIFIC USAID/W ACTION/RESOLUTION.
          
          THIS MEMO WILL BE USED BY THE OPERATING UNIT TO ADDRESS 
          CRITICAL ISSUES OR CHANGING CIRCUMSTANCES THAT MAY ALTER THE 
          MANAGEMENT CONTRACT SUCH AS SIGNIFICANT EVENTS THAT MAY AFFECT 
          VIABILITY OF ONE OR MORE SO'S, STAFFING ADJUSTMENTS, UNUSUAL 
          RESOURCE REQUESTS, AND RELATED WASHINGTON FOLLOW-UP ACTIONS. ALSO 
          USE THIS SECTION PER GUIDANCE IN II.D. ABOVE TO DESCRIBE CHANGES 
          MADE TO PERFORMANCE MONITORING PLANS CONSISTENT WITH SECTIONS II.A.1 
          AND II.D. ABOVE.  IT REPLACES THE PREVIOUS MANAGEMENT CONTRACT 
          SECTION OF PAST R4S.  THIS SECTION OF THE R4 IS NOT INTENDED FOR USE 
          OUTSIDE THE AGENCY.
          
          B.	R4 PART I:  OVERVIEW AND FACTORS AFFECTING PROGRAM
          ---- PERFORMANCE (2-3 PAGES).
          
          REQUIREMENTS FOR THIS SECTION HAVE NOT CHANGED, BUT ARE 
          LIMITED TO THAT NECESSARY FOR PERFORMANCE ASSESSMENT OF SPECIFIC 
          SO'S AND LINKAGE TO HIGHER LEVEL GOALS.  THE MISSION SHOULD INCLUDE: 
          SUMMARY PROGRESS IN IMPLEMENTING THE CURRENTLY APPROVED STRATEGIC 
          PLAN; SIGNIFICANT CHANGES THAT WOULD CAUSE YOU TO CHANGE OR 
          ELIMINATE AN OBJECTIVE OR ACCOUNT FOR POOR PERFORMANCE 
          (CRISIS/CONFLICT, ETC.); MOST SIGNIFICANT PROGRAM ACHIEVEMENTS, 
          REGARDLESS OF THE LEVEL, SO OR INTERMEDIATE RESULTS (I.R.); COUNTRY 
          FACTORS THAT HAVE MOST INFLUENCED PROGRESS; OVERALL PROSPECTS FOR 
          PROGRESS THROUGH THE BUDGET REQUEST YEAR, INCLUDING MISSION ACTIONS 
          TO OVERCOME FACTORS IMPEDING PROGRESS; PROSPECTS FOR SUCCESSFUL 
          CLOSEOUT OR GRADUATION, PARTICULARLY FOR COUNTRY PROGRAMS THAT WILL 
          CLOSE DURING OR IMMEDIATELY FOLLOWING THE R4 REPORTING PERIOD.  
          MISSIONS SHOULD INCLUDE HERE DISCUSSIONS OF THE U.S. NATIONAL 
          INTERESTS AND GOALS THAT ESTABLISHED THE CONTEXT FOR THE DEVELOPMENT 
          OF THE EMBASSY'S MPP AND THE LINKAGES OF MISSION SO'S TO THE MPP.
          
          OPERATING UNITS SCHEDULED TO EXIT BY FY 2000 TO 2002 ARE 
          REQUESTED TO PROVIDE INFORMATION ON PROGRAM CLOSEOUT OR GRADUATION.  
          BUILDING ON APPROVED OR DRAFT CLOSEOUT PLANS, USE THE R4 TO CONVEY 
          EXPECTED PROGRESS ACROSS THE PERIOD LEADING TO CLOSEOUT.  REINFORCE 
          YOUR DISCUSSION OF EXPECTED PROGRESS AND MANAGEMENT ACTIONS WITH THE 
          FOLLOWING:  (1) ASSESSMENT OF REALISTIC PROSPECTS FOR ACHIEVING EACH 
          OBJECTIVE WITHIN THE REMAINING TIMEFRAME; (2) MANAGERIAL AND 
          RESOURCE ADJUSTMENTS TO REINFORCE PROSPECTS FOR SUCCESS; (3) 
          MECHANISMS FOR ADVANCING SUSTAINABILITY; AND (4) STATUS OF CLOSEOUT 
          PLAN PREPARATION, APPROVAL OR IMPLEMENTATION.
          
          C.	R4 PART II:  RESULTS REVIEW BY SO:  (2-3 PAGES OF TEXT 
          PLUS 3-4 DATA TABLES PER RESULTS FRAMEWORK).  INFORMATION
          PROVIDED HERE WILL BE THE BASIS OF CP NARRATIVE.
          
          INFORMATION IN THIS SECTION SHOULD INCLUDE:
          
          -  BRIEF SUMMARY OF THE SO:  WHAT IS THE MISSION TRYING TO 
          ACHIEVE?  GENERALLY, THIS WILL CONSIST OF A CONCISE 
          STATEMENT-OF-CHANGE PLANNED AT THE SO LEVEL, PRINCIPAL INTERMEDIATE 
          RESULTS NECESSARY TO ACHIEVE THE SO, AND ULTIMATE CUSTOMERS. 
          
          -  SUMMARY PERFORMANCE STATEMENT:  CLEARLY STATE THE 
          MISSION'S SELF-ASSESSMENT OF THE SO AS EITHER ON-TRACK, EXCEEDING 
          EXPECTATIONS, OR NOT MEETING EXPECTATIONS (ONE OF THESE THREE MUST 
          BE USED).  ADD A BRIEF EXPLANATION OF SUMMARY RATINGS FOR 
          MIXED-PERFORMANCE SO'S, WHERE PROGRESS ON SOME I.R.'S WAS ON-TRACK 
          OR BETTER, AND PROGRESS ON OTHERS DID NOT MEET EXPECTATIONS.
          
          -  PERFORMANCE OVER THE PAST YEAR RELATIVE TO PLANS: 
          SIGNIFICANT CHANGES (POSITIVE OR NEGATIVE) ON THREE-TO-FOUR 
          INDICATORS SELECTED BY THE MISSION FROM THE SO'S PERFORMANCE 
          MONITORING PLAN, BECAUSE THEY MOST ACCURATELY DEPICT PERFORMANCE IN 
          THE REPORTING PERIOD, SHOULD BE DISCUSSED.  THE ACHIEVEMENT OF 
          INDICATOR TARGETS IS NOT NECESSARILY EQUIVALENT TO THE ACHIEVEMENT 
          OF RESULTS, SO TEXT SHOULD BE CLEAR HOW ACHIEVEMENTS IN THE SELECTED 
          INDICATORS DEMONSTRATES THAT RESULTS ARE BEING ACHIEVED.  FOCUS ON 
          RESULTS WHERE CHANGE HAS BEEN MOST MEANINGFUL: THE SO, PRINCIPAL 
          I.R.'S, AND/OR LOWER-LEVEL I.R.'S.  YOU ARE REQUESTED TO USE SUMMARY 
          OUTPUT DATA IF HIGHER LEVEL RESULTS DATA IS NOT AVAILABLE OR 
          INCOMPLETE.  DISCUSS LONGER-TERM SO PERFORMANCE TRENDS WHEREVER I
          MPORTANT TO PROVIDE PERSPECTIVE ON RECENT PROGRESS.  NOTE WHEN MORE 
          FORMAL, LARGER SCALE, EVALUATIONS CONTRIBUTED TO YOUR OVERALL 
          ASSESSMENT.
          
          -  WHEN DISCUSSING PROGRAM PERFORMANCE, MISSIONS SHOULD 
          PROVIDE INFORMATION (QUALITATIVE OR QUANTITATIVE) WHICH GIVES A 
          SENSE OF USAID'S RELATIVE ROLE AND CONTRIBUTION TO OVERALL 
          PERFORMANCE OVER THE PAST YEAR (ATTRIBUTION).  IT IS IMPORTANT TO 
          AVOID APPEARING TO CLAIM AS OUR OWN, RESULTS THAT ARE LARGELY BASED 
          ON EFFORTS OF OTHERS.  NOTE IN A SENTENCE OR TWO, THE KEY ACTIVITIES 
          BEING FUNDED BY USAID, AND THE PRINCIPAL CONTRACTORS, GRANTEES OR 
          AGENCIES IMPLEMENTING THE 
          OBJECTIVE. (NOTE: THE SPECIFICITY REQUESTED ON ACTIVITIES 
          AND IMPLEMENTORS FACILITATES THE PREPARATION OF THE CONGRESSIONAL 
          PRESENTATION ACTIVITY DATA SHEETS.)
          
          -  SINCE RESULTS AT THE SO LEVEL NORMALLY REFLECT THE 
          EFFORTS OF MULTIPLE PARTNERS, INFORMATION ON INVOLVEMENT AND 
          PROGRESS (OR LACK THEREOF) OF THE HOST COUNTRY AND OTHER DONORS IN 
          AREAS THAT SIGNIFICANTLY AFFECTED PROGRESS TOWARD THE SO WILL 
          PROVIDE CONTEXT TO USAID'S RELATIVE CONTRIBUTION TO CHANGE. 
          
          -  REGARDING EXPECTED PERFORMANCE THROUGH THE BUDGET 
          REQUEST YEAR, INCLUDING ANTICIPATED BENCHMARK ACHIEVEMENTS (AND/OR 
          THE MOST IMPORTANT BREAKTHROUGH NECESSARY FOR USAID TO HAVE AN 
          IMPACT ON THE SO) AND OUTLOOK FOR PROGRESS ON SO'S AND KEY I.R.'S 
          THAT HAVE NOT MET EXPECTATIONS, THE MISSION SHOULD INDICATE WHAT 
          WILL FAIL TO BE ACHIEVED SHOULD REQUESTED FUNDING NOT BE 
          FORTHCOMING, BUT PLEASE DO SO WITHOUT REFERENCING "PRE-DECISIONAL" 
          BUDGET LEVELS IN THE RESULTS REPORTING SECTION OF YOUR R4.  CITE 
          FACTORS SUCH AS MISSION PROGRAM ADJUSTMENTS, CHANGED POLICY 
          ENVIRONMENT, AND RECENTLY-RESOLVED ISSUES.  HERE IS WHERE A MISSION 
          CAN INDICATE HOW IT IS MANAGING FOR RESULTS.  NOTE IN A SENTENCE OR 
          TWO, NEW KEY ACTIVITIES LIKELY TO BE FUNDED BY USAID, IF ANY. 
          
          - FOR MISSION ADJUSTMENTS TO THE SO PLAN AND RESULTS 
          FRAMEWORK THAT DO NOT REQUIRE A STRATEGY REWRITE OR AMENDMENT, E.G., 
          MODIFICATION OF AN I.R., PERFORMANCE INDICATOR, OR TARGET, NOTE 
          WHICH OBJECTIVES OR I.R.'S HAVE BEEN SELECTED FOR CLOSEOUT OR 
          TERMINATION FOR PERFORMANCE REASONS.
          
          - DATA TABLES FOR THREE-TO-FOUR PERFORMANCE INDICATORS PER 
          SO RESULTS FRAMEWORK ONLY, SHOULD BE SELECTED FROM THE MISSION'S (SO 
          TEAM'S) PERFORMANCE MONITORING PLAN (PMP) BECAUSE THEY MOST 
          ACCURATELY DEPICT PERFORMANCE (POSITIVE OR NEGATIVE).  IF INDICATORS 
          SELECTED FROM THE PMP ARE BEING REPORTED ON FOR THE FIRST TIME, 
          PLEASE INDICATE WHY THEY ARE MORE USEFUL.  REPORTING UNITS CONTINUE 
          TO BE STRONGLY ENCOURAGED TO MAKE FULL USE OF THE "COMMENT" SECTION 
          OF EACH DATA TABLE TO ELABORATE ON THE INTERPRETATION OF THE 
          REPORTED DATA--  PARTICULARLY TO ADD QUALITATIVE INTERPRETATION TO 
          QUANTITATIVE DATA AND QUANTITATIVE SIGNIFICANCE TO QUALITATIVE 
          DATA--AND THE DEGREE TO WHICH ACHIEVEMENT OF A TARGET IS 
          ATTRIBUTABLE TO USAID.  THE COMMENT SECTION PROVIDES CONTEXT TO THE 
          DATA.  THE PROBABILITY OF MISUSE OR MISINTERPRETATION OF DATA RISES 
          DRAMATICALLY WHEN THERE IS NO CONTEXT.  FURTHER POSSIBLE INCLUSIONS 
          TO THE COMMENT SECTION ARE:  WHETHER AND HOW THE OPERATING UNIT 
          ASSESSED THE RELIABILITY OF PERFORMANCE DATA PROVIDED BY OTHERS 
          (E.G., CONTRACTORS, HOST GOV.), PLANS TO 
          VERIFY AND VALIDATE PERFORMANCE DATA, AND SIGNIFICANT DATA 
          LIMITATIONS AND THEIR IMPLICATIONS FOR MEASURING PERFORMANCE RESULTS 
          AGAINST ANTICIPATED PERFORMANCE TARGETS.     
          
          
          SUPPLEMENTARY FORMATTING GUIDANCE:
          
          TO FACILITATE SUBSEQUENT USE OF THIS SECTION FOR THE 
          CONGRESSIONAL PRESENTATION, WE SUGGEST THAT YOU STRUCTURE THE 
          INFORMATION FOR THIS SECTION UNDER THE FOLLOWING CP FORMAT HEADINGS:  
          SUMMARY, KEY RESULTS, PERFORMANCE AND PROSPECTS, POSSIBLE ADJUSTMENT 
          TO PLANS, OTHER DONOR PROGRAMS, MAJOR CONTRACTORS AND GRANTEES.
          
          IF YOU FEEL THE NEED TO GO BEYOND THE 2-3 PAGE LIMIT FOR 
          THIS SECTION TO PROVIDE ADDITIONAL INFORMATION ON A PARTICULAR SO 
          FOR A SPECIFIC TARGET AUDIENCE, YOU MAY APPEND TO THE R4 DOCUMENT AN 
          INFORMATION ANNEX FOR THAT PURPOSE AS EXPLAINED IN III.G. BELOW.  
          THE INTENDED TARGET AUDIENCE SHOULD BE NOTED AT THE TOP OF THE ANNEX 
          TO ENSURE IT IS PROVIDED.  WHILE USE OF SUCH ANNEXES IS PERMITTED, 
          IT IS NOT ENCOURAGED.  INFORMATION PROVIDED IN SUCH AN ANNEX WILL 
          NOT BE USED BY USAID/W TO AUGMENT THE PERFORMANCE ASSESSMENT OF AN 
          SO IN THE RESULTS REVIEW PORTION OF THE R4.  LENGTH SHOULD BE 
          LIMITED.
          
    	D.	R4 PART III (OLD):  STATUS OF THE MANAGEMENT CONTRACT
    
          IT WAS THE INTENTION OF THE ADS THAT THIS SECTION OF THE 
          R4 WOULD PROVIDE THE OPPORTUNITY TO UPDATE AND/OR REVALIDATE THE 
          STATUS OF THE MANAGEMENT CONTRACT BETWEEN BUREAUS AND THEIR 
          OPERATING UNITS.  AS A RESULT OF THE STREAMLINING EFFORT, 
          CIRCUMSTANCES THAT ALTER THE MANAGEMENT CONTRACT WILL NOT BE COVERED 
          IN THE BODY OF THE R4, BUT SHOULD INSTEAD BE DISCUSSED CANDIDLY IN 
          THE COVER MEMO DESCRIBED ABOVE. 
          
    	E.	R4 PART III (NEW):  RESOURCE REQUEST: (2 PAGES OF TEXT.
          -    RESOURCE TABLES ADDITIONAL.) 
          
          THIS SECTION IS LARGELY UNCHANGED FROM LAST YEAR.  IT 
          SHOULD CONTAIN:
          
          -  A BRIEF RATIONALE FOR PROGRAM RESOURCE LEVEL AND SO 
          ALLOCATIONS, INCLUDING REASONS FOR SIGNIFICANT INCREASES/DECREASES 
          IN OYB/CP LEVELS ESTABLISHED ON THE BASIS OF THE PAST YEAR'S R4.
          
          -  DISCUSS WAYS IN WHICH PERFORMANCE-INFLUENCED RESOURCE 
          DECISIONS, ESPECIALLY FOR SO'S NOT MEETING EXPECTATIONS AND REPEAT 
          POOR PERFORMERS; 
          
          
          -  DISCUSS THE RELATIONSHIP OF THE PROGRAM REQUEST TO OE 
          AND STAFFING REQUIREMENTS, INCLUDING "CRITICAL" STAFFING 
          REQUIREMENTS AND JUSTIFICATION FOR RESOURCE REQUESTS (PROGRAM FUNDS, 
          WORKFORCE, OR OE) THAT EXCEED BUREAU-ASSIGNED CONTROL LEVELS.
          -  FOR EACH SO, EXPLAIN ANY INCONSISTENCIES BETWEEN 
          PIPELINE LEVELS AS OF SEPTEMBER 30, 1998, AND AGENCY FORWARD FUNDING 
          GUIDELINES PIPELINES SHOULD COVER 12-TO-24 MONTHS OF PLANNED 
          EXPENDITURES, I.E., OBLIGATIONS GENERALLY SHOULD FUND PROJECTED 
          EXPENDITURES THROUGH THE END OF THE FISCAL YEAR FOLLOWING THE YEAR 
          IN WHICH FUNDS ARE OBLIGATED.  DESCRIBE ANY CORRECTIVE ACTION BEING 
          TAKEN, AND PROVIDE A BRIEF DESCRIPTION OF HOW PIPELINE LEVELS 
          PROJECTED THROUGH THE PLANNING PERIOD WILL BE CONSISTENT WITH THE 
          FORWARD FUNDING GUIDELINES. 
          
          -  INCLUSION OF G FIELD SUPPORT TABLE.  WITH MINOR 
          MODIFICATIONS TO FOCUS ON THE OUTYEARS AS OPPOSED TO THE OYB, THE 
          FIELD SUPPORT TABLE WILL BE THE SAME AS LAST YEAR'S.  THIS TABLE 
          ESTIMATES THE VOLUME AND TYPE OF SERVICES--FIELD SUPPORT AND 
          BUY-INS--THAT WILL NEED TO BE PROVIDED BY THE G BUREAU.  IT NEEDS TO 
          LIST SERVICES TO BE PROVIDED THROUGH G-MANAGED CONTRACTS, 
          COOPERATIVE AGREEMENTS AND GRANTS, WITH A HIGH-SIDE ESTIMATE OF THE 
          LEVEL OF RESOURCES NEEDED TO FULLY FUND THESE SERVICES.  THE TABLE 
          PROVIDES A DISTINCTION FOR:  (A) FUNDS THAT ARE PART OF THE UNIT'S 
          PLANNING LEVEL, BUT DESIGNATED FOR OBLIGATION AND MANAGEMENT BY THE 
          G BUREAU; AND (B) FUNDS THAT ARE PART OF THE UNIT'S PLANNING LEVEL 
          AND OYB AND OBLIGATED OR SUBOBLIGATED BY THE UNIT THROUGH G BUREAU 
          MECHANISMS (UNIT OBLIGATION, GENERALLY REFERRED TO AS BUY-IN).  IN 
          ADDITION, PLEASE SPECIFY THE FOLLOWING IN THE FIELD SUPPORT TABLE:    
          (1) THE SO FOR WHICH THESE SERVICES ARE NEEDED, (2) THE NAME AND 
          NUMBER OF THE G BUREAU ACTIVITY TO BE USED, (3) THE LEVEL OF 
          PRIORITY THE UNIT PLACES ON THE FIELD SUPPORT AND BUY-IN SERVICES, 
          (4) THE DURATION OF THE FIELD SUPPORT AND BUY-IN SERVICES; AND (5) 
          THE NAME OF THE ENTITY OBLIGATING THE
          FUNDS--G OR OPERATING UNIT.  FOR FY 2000 AND FY 2001, 
          MISSIONS SHOULD THINK CREATIVELY ABOUT WHAT TYPES OF SERVICES ARE 
          NEEDED, EVEN IF THE G BUREAU DOES NOT APPEAR TO HAVE AN EXISTING 
          MECHANISM AT THE PRESENT TIME.  OPERATING UNITS SHOULD DESCRIBE IN A 
          FOOTNOTE SERVICE REQUESTS THAT GO BEYOND EXISTING G BUREAU 
          MECHANISMS.
          
          F.	WORKFORCE AND OE 
          
          THERE ARE FOUR BASIC DATA SUBMISSION REQUIREMENTS FOR 
          WORKFORCE AND OPERATING EXPENSES:
          
            1)	WORKFORCE (TABLE WF-XXXXX.WK4 USED BY EACH OPERATING 
          UNIT IN WASHINGTON AND OVERSEAS), SHOWING THE DISTRIBUTION OF THE 
          VARIOUS TYPES OF WORKFORCE (END OF YEAR ON-BOARD LEVELS) BY SO/SPO 
          AND BY MANAGEMENT CATEGORIES.  TOTALS MUST BE IN WHOLE NUMBERS;
          
          	  2)	OPERATING EXPENSES (TABLE OE-XXXXX.WK4 USED BY 
          OVERSEAS OPERATING UNITS AND TABLE--USED BY WASHINGTON OPERATING 
          UNITS), SHOWING THE PROPOSED USE OF OE AND TRUST FUND RESOURCES BY 
          RESOURCE CATEGORY FOR THE FY 99 ESTIMATE, 
          FY 2000 AND FY 2001 TARGET AND REQUEST LEVELS.  FOR 
          OVERSEAS OE TABLES, IDENTIFY THE U.S. DOLLARS USED FOR LOCAL 
          CURRENCY PURCHASES AND THE EXCHANGE RATE USED IN COMPUTATIONS.
          
          	  3)	TRUST FUND AND FSN VOLUNTARY SEPARATION 
          PAYMENT/WITHDRAWAL INFORMATION (TABLE TF-FSN.WK4 USED ONLY BY 
          OVERSEAS OPERATING UNITS) SHOWING A) AVAILABILITY OF LOCAL CURRENCY 
          TRUST FUNDS AND B) DEPOSITS TO AND WITHDRAWALS FROM THE FSN 
          VOLUNTARY SEPARATION ACCOUNT.  PLEASE NOTE THAT IF AN OVERSEAS UNIT 
          SHOWS OBLIGATIONS UNDER OBJECT CLASS 12.1 ON THE OE TABLE FOR FSN 
          VOLUNTARY SEPARATION (FSN DIRECT HIRE OR FSN PSC), THEN THE FSN 
          VOLUNTARY SEPARATION PORTION OF THIS TABLE MUST BE SUBMITTED.  THE 
          OE TOTALS ON THIS TABLE MUST MATCH THE TOTAL FSN VOLUNTARY 
          SEPARATION AMOUNTS ROE FSN DIRECT-HIRE AND FSN PSCS ON THE OE TABLE.  
          ALSO, EXCHANGE RATES USED IN COMPUTING THE DOLLAR EQUIVALENT OF 
          LOCAL CURRENCY TRUST FUNDS MUST BE PROVIDED--THIS INFORMATION IS 
          REQUIRED TO BE INCLUDED IN THE AGENCY'S CONGRESSIONAL PRESENTATION.
          
          	  4)	CONTROLLER OPERATIONS (TABLE CO-XXXXX.WK4).  THIS IS 
          IN THE SAME FORMAT AS THE OVERSEAS OE TABLE, BUT IS TO REFLECT ONLY 
          THOSE COSTS ASSOCIATED WITH THE OFFICE OF THE CONTROLLER AT OVERSEAS 
          MISSIONS.
          
          WITH THE EXCEPTION OF SOME REFORMATTING OF THE WORKFORCE 
          TABLE, ALL TABLES ARE THE SAME AS LAST YEAR.  SEPARATE SPECIAL 
          SCHEDULES WILL BE PROVIDED TO M, G, GC, AND LPA FOR THEIR 
          "ADMINISTRATIVE EXPENSE COST CENTER" BUDGET ACCOUNTS.
          
          M/B WILL ISSUE FY 1999 OE AND U.S. DIRECT-HIRE WORKFORCE 
          LEVELS TO BUREAUS (INCLUDING LEVELS AVAILABLE FOR OVERSEAS 
          MISSIONS), FYÊ2000 TARGETS, AND FY 2001 TARGETS AT A LATER DATE.
          IN ADDITION TO THE TABULAR INFORMATION, EACH OPERATING 
          UNIT MUST PROVIDE NARRATIVE EXPLAINING THE IMPACT OF FY 2000 AND
          FY 2001 TARGETS ON THEIR OPERATIONS.  THE OE AND WORKFORCE 
          TABLES ALSO PROVIDE UNITS WITH THE ABILITY TO REQUEST LEVELS 
          DIFFERENT FROM THE FY 2000 AND FY 2001 TARGET LEVELS (REQUEST 
          LEVELS).  IF A UNIT SUBMITS A REQUEST LEVEL IN ADDITION TO THE 
          TARGET LEVEL FOR FY 2000 AND/OR FY 2001, THE NARRATIVE MUST 
          THOROUGHLY JUSTIFY THE NEED FOR THE REQUEST LEVEL AND IDENTIFY THE 
          SPECIFIC ACTIONS (WHETHER PROGRAM OR OE RELATED) WHICH WOULD BE 
          TAKEN IF THE UNIT WERE TO BE HELD TO THE TARGET LEVEL.
          
          G.	SUPPLEMENTAL INFORMATION ANNEXES
          
          AS NOTED AT THE END OF SECTION III.C. ABOVE, MISSIONS THAT 
          DESIRE TO PROVIDE ADDITIONAL INFORMATION TO SPECIFIC TARGET 
          AUDIENCES ON PROGRAM RELATED MATTERS MAY, OF THEIR OWN ACCORD, USE 
          AN ANNEX FOR THIS PURPOSE. 
          
          BUREAU MAY REQUEST ADDITIONAL REPORTING FOR PURPOSES OTHER 
          THAN ASSESSING COUNTRY SO PERFORMANCE (SUCH AS REGIONAL TREND 
          ANALYSIS, REPORTING ON MULTI-COUNTRY INITIATIVES, AND SPECIAL 
          EXTERNAL REPORTING NEEDS THAT MAY VARY YEAR-TO-YEAR).  THIS 
          REPORTING WILL BE PROVIDED THROUGH SUPPLEMENTAL ANNEXES SO AS TO 
          FOCUS THE MAIN R4 TEXT ON PERFORMANCE VIS-A-VIS AGREED UPON STRATEGY 
          OBJECTIVES.  A FOLLOW-UP CABLE IS PLANNED FOR JANUARY WHICH WILL 
          INCLUDE ALL REQUESTS FOR SUPPLEMENTARY REPORTING FROM WASHINGTON FOR 
          THIS R4 CYCLE.  PPC AND THE INTER-BUREAU R4 WORKING GROUP WILL 
          STRIVE TO KEEP THESE REQUIREMENTS CLEAR, LIMITED AND VOLUNTARY.  
          OPERATING UNITS SHOULD ADVISE PPC/PC IF THEY RECEIVE REQUESTS FOR R4 
          REPORTING WHICH DOES NOT APPEAR TO HAVE BEEN SPECIFICALLY APPROVED 
          BY PPC.  REQUESTS WILL CLEARLY IDENTIFY THE UNIT MAKING THE REQUEST, 
          THE USE TO WHICH INFORMATION WILL BE PUT AND SPECIFIC QUESTIONS 
          WHICH UNITS WOULD BE ASKED TO ADDRESS.  UNLESS SPECIFICALLY STATED 
          OTHERWISE, THIS ADDITIONAL REPORTING WILL BE CONSIDERED VOLUNTARY. 
          
          THE ONLY MANDATORY ANNEXES IDENTIFIED AT THIS POINT 
          INCLUDE THE TITLE II SUPPLEMENTARY PERFORMANCE DATA REQUIRED BY BHR 
          FOR STAND-ALONE NON-EMERGENCY TITLE II PROGRAMS, AND THE 
          NON-PRESENCE REPORTING ANNEXES.  ONLY SOME MISSIONS ARE AFFECTED BY 
          THESE REQUIREMENTS.  SEE SECTION IV.B AND D BELOW FOR DETAILS.
          
          IV.	SPECIAL REPORTING SITUATIONS 
          
          A. 	G BUREAU FIELD SUPPORT 
          
          THE DEVELOPMENT IMPACT OF GLOBAL BUREAU FIELD SUPPORT 
          (SERVICES AND COMMODITIES REQUESTED AND FUNDED BY OPERATING UNITS) 
          WILL BE CAPTURED AND REPORTED IN MISSION STRATEGIC OBJECTIVES.
          
          
          B. BHR PROGRAMMED RESOURCES 
          
          BHR IS SEEKING WAYS TO SIMPLIFY REPORTING REQUIREMENTS FOR 
          PL-480 PROGRAMS TO PARALLEL CHANGES TAKING PLACE WITH DOLLAR- FUNDED 
          PROGRAMS.  ON NOVEMBER 30, 1998 GUIDANCE WAS ISSUED TO COOPERATING 
          SPONSORS (CS) AND MISSIONS ON RESULTS REPORTING FOR TITLE II 
          PROGRAMS.  THIS GUIDANCE REQUESTED THAT CS RESULTS REPORTS BE MADE 
          AVAILABLE TO MISSIONS BY JANUARY 30TH (AND TO BHR/FFP BY MARCH 1ST) 
          SO AS TO SERVE AS INPUT IN PREPARATION OF THE R4S AS NEEDED.  TO 
          HELP MEET CONGRESSIONAL REPORTING REQUIREMENTS FOR TITLE II AND 
          TITLE III RESOURCES, THE FOLLOWING INFORMATION SHOULD BE INCLUDED IN 
          R4 DOCUMENTS:
          
          1. INTEGRATED PROGRAMS:  IN CASES WHERE TITLE II/III AND 
          DOLLAR-FUNDED ACTIVITIES ARE INTEGRATED TO SUPPORT ONE OR MORE 
          STRATEGIC OR SPECIAL OBJECTIVES, THE SO PERFORMANCE NARRATIVE MUST 
          INCLUDE A BRIEF DESCRIPTION OF THE CONTRIBUTION AND EFFECTIVENESS OF 
          PL-480 RESOURCES TO ENHANCED FOOD SECURITY IN THE COUNTRY USING 
          APPROPRIATE QUANTIFIABLE INDICATOR DATA FROM THE PERFORMANCE 
          MONITORING PLAN.  BHR/FFP HAS AN ILLUSTRATIVE LIST OF INDICATORS FOR 
          THIS PURPOSE AND CAN ADVISE, IF NECESSARY, ON WHICH ONE OF YOUR 
          EXISTING INDICATORS WOULD WORK BEST. 
          
          THE SO PERFORMANCE NARRATIVE CONTAINED IN THE R4 WILL FORM 
          THE BASIS OF THE AGENCY'S PERFORMANCE ASSESSMENT FOR INTEGRATED 
          PROGRAMS.  BHR REVIEW OF PREVIOUSLY APPROVED ACTIVITY (PAA) 
          SUBMISSIONS WILL CONTINUE.
          
          COOPERATING SPONSORS AND MISSION SO TEAMS ARE EXPECTED TO 
          WORK TOGETHER IN REVIEWING THE UTILITY AND COST/BENEFIT OF 
          PERFORMANCE INDICATORS FOR THE ENTIRE SO INCLUDING INDICATORS USED 
          BY TITLE II SPONSORS AS SPECIFIED IN PRIOR AGREEMENTS.  AGREEMENT ON 
          ELIMINATION OF CS INDICATORS WILL BE CONFIRMED THROUGH PAA REVIEWS 
          WITH MISSION INPUTS, THROUGH OTHER CONSULTATIONS WITH MISSIONS AND 
          BHR/FFP, AND IF NECESSARY, THROUGH GRANT OR COOPERATIVE AGREEMENTS 
          AMENDMENTS.
          
          2. STAND-ALONE PROGRAMS:  WHEN NON-EMERGENCY TITLE II AND 
          TITLE III RESOURCES DO NOT CONTRIBUTE DIRECTLY TO A STRATEGIC OR 
          SPECIAL OBJECTIVE, MISSIONS ARE ASKED TO INCLUDE A SPECIAL 
          INFORMATION ANNEX TO THE R4 PER SECTION III.G. ABOVE WHICH ADDRESSES 
          IN 1-2 PAGES THE FOLLOWING INFORMATION:  (1) THE CONTRIBUTION OF 
          THESE RESOURCES TO FOOD SECURITY IN THE COUNTRY; AND (2) THE 
          EFFECTIVENESS OF THE PROGRAMS SUPPORTED WITH THESE RESOURCES IN 
          ACHIEVING RESULTS AGREED UPON IN THE RELEVANT DEVELOPMENT ACTIVITY 
          PROPOSAL (DAP).  THE CS REPORTS ON TITLE II ACTIVITIES SHOULD BE 
          REFERENCES IN THE ANNEX PROVIDED DIRECTLY TO BHR/FFP IN ADDITION TO 
          THE MISSIONS.  BHR/FFP WILL USE THIS INFORMATION, ALONG WITH PAA 
          SUBMISSIONS, TO MAKE FOOD RESOURCE ALLOCATION DECISIONS.  CS ARE 
          ENCOURAGED TO FOLLOW THE GUIDANCE IN SECTION II.A.1. OF THIS CABLE 
          RELATED TO ELIMINATING PERFORMANCE MEASURES THAT ARE NOT USEFUL FOR 
          USAID/CS MANAGEMENT PURPOSES AND/OR WHICH ARE NOT COST EFFECTIVE TO 
          COLLECT.  AGREEMENT ON ELIMINATION OF CS INDICATORS WILL BE 
          CONFIRMED THROUGH PAA REVIEWS WITH MISSION INPUTS, THROUGH OTHER 
          CONSULTATIONS WITH MISSIONS AND BHR/FFP, AND IF NECESSARY, THROUGH 
          GRANT OR COOPERATIVE AGREEMENTS AMENDMENTS.
           
          3. OTHER PROGRAMS:  BHR WILL REPORT ON TITLE II EMERGENCY, 
          DISASTER AND TRANSITION ASSISTANCE (IDA) RESULTS AND RESOURCE NEEDS, 
          AND MAY CONTACT RELEVANT OPERATING UNITS FOR ASSISTANCE IN DOING SO.  
          BHR WILL ALSO REPORT ON PVC GRANTS TO STRENGTHEN THE CAPACITY OF 
          USAID'S PVO AND CDO PARTNERS AS WELL AS ASHA GRANTS. 
          
          C.   CLOSEOUT AND GRADUATION
            
          IN KEEPING WITH APPROVED CLOSEOUT PLANS, IF NOT PREVIOUSLY 
          REPORTED OR IF THERE ARE CHANGES IN WHAT WAS PREVIOUSLY REPORTED, 
          PLEASE REPORT THE FOLLOWING IN A SPECIAL INFORMATION ANNEX PER 
          SECTION III.G. ABOVE: (1) BRIEF SCHEDULE FOR TERMINATION OF PRINCIPA
          L ACTIVITIES; AND (2) RECOMMENDATIONS TO CONTINUE SELECTED 
          ACTIVITIES AFTER CLOSEOUT WITH RELATED RATIONALE AND PLAN (ON AN 
          EXCEPTION BASIS).
          
          D.	NON-PRESENCE COUNTRIES (NPC)
          
          THE NUMBER OF USAID-FUNDED ACTIVITIES IN NON-PRESENCE 
          COUNTRIES IS CREATING INCREASED MANAGEMENT VULNERABILITY AND DEMANDS 
          FOR MORE COUNTRY LEVEL R4-LIKE REPORTING (THREE ENI NPC PROGRAMS 
          ALREADY HAVE FULL R4'S PREPARED EVERY YEAR).  WE ARE SEEKING TO ENSU
          RE THAT EVERY NPC PROGRAM WITH DEFINED COUNTRY-LEVEL STRATEGIC OR 
          SPECIAL OBJECTIVES IS SUBJECT TO R4 REPORTING.  AT THE REGIONAL 
          BUREAUS' DISCRETION, THIS REPORTING MAY CONSIST OF A FULL R4 OR AN 
          ABBREVIATED R4-LIKE DOCUMENT AS OUTLINED BELOW. 
          
          USAID REGIONAL OFFICES AND BILATERAL MISSIONS WHICH HAVE 
          BEEN ASSIGNED SPECIFIC OVERSIGHT RESPONSIBILITIES FOR NPC PROGRAMS 
          WITH COUNTRY-LEVEL OBJECTIVES NON-PRESENCE COUNTRIES BY THEIR 
          REGIONAL BUREAUS, ARE REQUESTED TO PREPARE EITHER A FULL OR 
          ABBREVIATED (CONSULT WITH YOUR BUREAU TO DETERMINE WHICH) R4 
          SUBMISSION FOR EACH NON-PRESENCE COUNTRY.  IN THE CASE OF 
          ABBREVIATED R4 REPORTS, THESE MAY BE INCLUDED AS AN ANNEX TO THE 
          OPERATING UNITS' OWN R4 DOCUMENT (ONE ANNEX PER NPC).  MISSIONS WITH 
          BILATERAL OR TWINNING RESPONSIBILITIES FOR 
          TITLE II PROGRAMS ARE ALSO REQUESTED TO SUBMIT A 
          SUPPLEMENTAL ANNEX AS DISCUSSED IN SECTION IV.B.2. ABOVE 
          (STAND-ALONE PROGRAMS). MISSIONS WHO ARE UNABLE TO COMPLY WITH THIS 
          NEW REQUEST SHOULD CONSULT WITH THEIR REGIONAL BUREAU FOR 
          ASSISTANCE.  REGIONAL BUREAU WILL MAKE A FINAL DETERMINATION 
          REGARDING WHICH NPC COUNTRIES WILL BE COVERED BY R4 REPORTS THIS 
          YEAR BY ABBREVIATED R4-LIKE SUMMARIES.  DUE TO THEIR LINKAGES WITH 
          REGIONAL STATE BUREAUS AND THE MPP PROCESS, USAID REGIONAL BUREAUS 
          WILL LIKELY BECOME ULTIMATELY RESPONSIBLE FOR NPC REPORTING.  THEY 
          SHOULD, THEREFORE, CONSIDER POSSIBLE FUTURE REPORTING REQUIREMENTS 
          WHEN APPROVING NPC ACTIVITIES IN THEIR REGION.
          
          THE FOLLOWING ITEMS SHOULD BE COVERED IN 2-4 PAGES FOR THE 
          ABBREVIATED R4-LIKE NPC ANNEXES:
          
          - A PROGRAM OVERVIEW, OUTLINING THE OBJECTIVES BEING 
          PURSUED (WHEN THESE EXIST) AND/OR ACTIVITIES BEING IMPLEMENTED. 
          - AN INDICATION OF THE LINKAGES BETWEEN USAID-FUNDED 
          INTERVENTIONS AND THE MPP GOALS FOR THAT COUNTRY. THIS IS AS 
          CRITICAL FOR NPCS AS FOR PRESENCE COUNTRIES.
          - A DISCUSSION OF SIGNIFICANT PROGRAM ACHIEVEMENTS AND HOW 
          THESE ARE CONTRIBUTING TO MPP GOALS.
          - RELATED DATA TABLES FOR INDICATORS AND RESOURCE 
          REQUESTS. 
          
          
          V.	CHANGES IN WASHINGTON REVIEW OF R4S
          
          THE FOLLOWING PROVIDES SUMMARY INFORMATION TO MISSIONS ON 
          CHANGES TO THE R4 REVIEW PROCESSES IN WASHINGTON.  THIS IS NOT A 
          COMPREHENSIVE LIST, BUT IS INTENDED TO PROVIDE A BETTER 
          UNDERSTANDING OF THE CHANGED CONTEXT IN WHICH R4'S WILL BE REVIEWED.
          
          THIS YEAR, THERE WILL BE NO NUMERICAL SCORE CALCULATED BY 
          WASHINGTON REVIEWERS FOR EACH OBJECTIVE.  INSTEAD, READERS WILL NOTE 
          THE MISSION'S SELF-ASSESSMENT AND ONLY REQUEST FOLLOW-UP QUESTIONS 
          IF THERE ARE SIGNIFICANT REASONS TO DOUBT THE OVERALL SELF-ASS
          ESSMENT.  THIS SHOULD SIGNIFICANTLY REDUCE THE NEED FOR DETAILED 
          BACK AND FORTH DISCUSSIONS ON INDICATORS AND INDICATOR METHODOLOGY.  
          THE OVERALL MISSION SUMMARY ASSESSMENT (MET, EXCEEDED OR FELL SHORT) 
          WILL CONSTITUTE THE PERFORMANCE SUMMARY FOR THAT SO.  QUESTIONING OF 
          ASSESSMENTS WILL OCCUR ONLY IF THEY APPEAR TO LACK CANDOR AND BE 
          WELL OUT OF ALIGNMENT WITH USAID/W EXPECTATION, WHICH IS TYPICALLY 
          BASED ON A GENERAL KNOWLEDGE FROM TDYS, EVALUATIONS, AND REPORTS 
          FROM OTHER SOURCES.  
          THE THREE NON-PERFORMANCE FACTORS THAT INFORM THE BUDGET 
          PROCESS--NEED, COUNTRY COMMITMENT, AND FOREIGN POLICY--WILL CONTINUE 
          TO INFORM BUDGET ALLOCATION DECISIONS, BUT NO ATTEMPT WILL BE MADE 
          TO CONVERT THESE INTO NUMERICAL SCORES.  PPC AND THE REGIONAL B
          UREAUS WILL PROVIDE INFORMATION ON NON- PERFORMANCE FACTORS.  A 
          SUMMARY TABLE WILL BE PREPARED BY EACH BUREAU SHOWING FOR EACH SO 
          THE FINAL PERFORMANCE SUMMARY AND THE THREE NON-PERFORMANCE 
          CATEGORIZATIONS.  NO EFFORT WILL BE MADE TO CREATE A COMPOSITE SUM
          MARY SCORE INCORPORATING ALL FACTORS.  THE SUMMARY TABLE WILL BE 
          USED BY BUREAUS AS A STARTING POINT FOR RESOURCE ALLOCATION 
          DECISIONS. 
          
          THE PRESUMPTION FOR BUDGET ALLOCATION PURPOSES IS THAT ALL 
          APPROVED OBJECTIVES ARE IMPORTANT TO THE AGENCY AND SHOULD RECEIVE 
          THE RESOURCES NEEDED TO SUSTAIN PROGRESS.  IN THE SHORT-TERM 
          (ONE-TO-TWO YEARS), DIFFICULTIES IN ACHIEVING EXPECTED PROGRESS ON A 
          PARTICULAR SO SHOULD RESULT IN INCREASED MANAGEMENT ATTENTION AT 
          BOTH MISSION AND WASHINGTON LEVELS.  IF, AFTER REASONABLE EFFORTS, 
          PROGRESS IS NOT IMPROVED, THEN IT FOLLOWS THAT THE BUDGET PLANNED 
          FOR THAT SO MAY BE REDUCED, TEMPORARILY SUSPENDED, OR EVEN 
          REALLOCATED COMPLETELY AND THE SO TERMINATED OR SIGNIFICANTLY 
          REDESIGNED.  SUCH DECISIONS WILL BE ARRIVED AT COLLABORATIVELY BY 
          MISSION AND WASHINGTON MANAGEMENT.
          
          OBJECTIVES WHOSE PERFORMANCE SIGNIFICANTLY EXCEEDS 
          EXPECTATIONS WILL LIKELY RECEIVE SPECIAL ATTENTION IN AGENCY ANNUAL 
          PERFORMANCE REPORTS (APR).  HIGH PERFORMANCE WILL NOT NECESSARILY 
          JUSTIFY A CLAIM FOR ADDITIONAL RESOURCES BEYOND THAT NEEDED TO 
          ACHIEVE AGREED UPON RESULTS.
          
          THOSE MISSIONS SELECTED BY THEIR BUREAUS FOR A FULL 
          PROGRAM WEEK (ROUGHLY ONE-THIRD OF COUNTRY PROGRAMS) CAN EXPECT A 
          FULL AND DETAILED REVIEW OF THEIR PROGRAM.  THOSE NOT SUBJECT TO A 
          PROGRAM WEEK REVIEW SHOULD, NEVERTHELESS, BE MINDFUL OF THE NEED TO 
          MAINTAIN ADEQUATE INFORMATION FLOW WITH WASHINGTON.
          
          MISSIONS SHOULD NO LONGER EXPECT REGULAR ANNUAL MANAGEMENT 
          CONTRACT CABLES.  RATHER, THESE WILL BE PREPARED ONLY WHEN THERE ARE 
          SPECIFIC CHANGES TO THE MANAGEMENT CONTRACT INITIATED WITH APPROVAL 
          OF THE COUNTRY (OR UNIT) STRATEGIC PLAN. 
          
          THE ADS WILL BE REVISED WHERE NECESSARY (E.G., 203.3.5.F, 
          AND 201.5.12.C, AMONG OTHERS) TO REFLECT CHANGES IN THE R4 
          DOCUMENTATION AND REVIEW PROCESS.  
          
          VI.  MINIMIZE CONSIDERED FOR ASMARA, DAR ES SALAAM, 
          NAIROBI, KINSHASA, AND TIRANA. YY
          
          AID/GC:STISA(DRAFT)	
          S/RPP:TGREENTREE(DRAFT)
          AID/ES:RCONROY  Y  
          
          NAIROBI PRIORITY
          KINSHASA PRIORITY 
          RIGA PRIORITY
          TIRANA PRIORITY   Y        

Return to FY2001 R4 Materials